2010 Falesti Orphanage

Replace broken sink

Provide showers (their wish list is 6 showers per floor – 3 floors)

Update plumbing

Provide toilet seats 

Replace broken toilet

Replace mixer taps on sinks

Damaged pipe in roof space leaking within walls down all 3 floors causing damage to walls and ceiling

Electrical:

 Replace existing lighting with waterproof units

Orphanage Lighting to be replaced with water proof lighting

Decorating / other repair work

 Repair walls and redecorate where necessary.

 Re-fit ceiling back properly

Decorating the hall way


Dormitories  
 
Clothes washing room 
Old washers

Old washers

Old washers

  
Split main dormitories into smaller rooms (3-4 beds in each)

New Beds / furniture

Bedding

Decorate

Decorating

Artwork on walls

Replace lighting

2 Industrial washing machines

2 Industrial dryers

Decorate room (very damp though)

Ironing boards

Irons

Replace lighting with Waterproof units

Kitchen / dining room 
 
Computer room 

Computers need updating
 
Hallways 
 
 
Note:
Two relatively new industrial boilers in plant room – they requested that we provide piping from those boilers into the dormitory block (75-100 mts away) so that hot water can be piped to dormitory block. Main piping already exists to run the radiators – not convinced that it will be possible to use same boilers to provide hot water as there may only be a single feed / return and it may closed loop with inhibitors in it.  Gas fired boilers are cheaper to run than electric and the one electric boiler they do have (running 2 showers in the main dormitory block) is very expensive to run. 
 
Provide replacement computers

Provide small hot water heaters over sinks (and in kitchens)

Tables and chairs required

Kitchen equipment required

Good decoration – but some artwork would really improve the area

 

Scroll To Top