Provide showers (their wish list is 6 showers per floor – 3 floors)

Provide toilet seats

Replace mixer taps on sinks
Damaged pipe in roof space leaking within walls down all 3 floors causing damage to walls and ceiling
Electrical:
Replace existing lighting with waterproof units

Decorating / other repair work
Repair walls and redecorate where necessary.
Re-fit ceiling back properly

Dormitories
Clothes washing room 


Split main dormitories into smaller rooms (3-4 beds in each)
New Beds / furniture
Bedding
Decorate

Artwork on walls
Replace lighting
2 Industrial washing machines
2 Industrial dryers
Decorate room (very damp though)
Ironing boards
Irons
Replace lighting with Waterproof units
Kitchen / dining room
Computer room

Hallways
Note:
Two relatively new industrial boilers in plant room – they requested that we provide piping from those boilers into the dormitory block (75-100 mts away) so that hot water can be piped to dormitory block. Main piping already exists to run the radiators – not convinced that it will be possible to use same boilers to provide hot water as there may only be a single feed / return and it may closed loop with inhibitors in it. Gas fired boilers are cheaper to run than electric and the one electric boiler they do have (running 2 showers in the main dormitory block) is very expensive to run.
Provide replacement computers
Provide small hot water heaters over sinks (and in kitchens)
Tables and chairs required
Kitchen equipment required
Good decoration – but some artwork would really improve the area
Help support TEECH and the work we do by Donating via BT's MyDonate - Quick, Easy Credit/Debit card payment. Please help us continue making a difference and DONATE or JOIN our charity.
TEECH is a UK registered Charity 1074765 Registered address:- 1 Mandy Close, Ipswich, Suffolk IP4 5JE
Gemma - Mobile 0779 5254946